Lowbed / Heavy Haul Trailer

Detachable Gooseneck Lowboy Trailer 60T

60 t detachable gooseneck lowboy trailer with a 12.5 m drop deck for excavators and engineering equipment. The neck detaches for drive-on loading; 2, 3 or 4 axles, mechanical or…

Highlights

  • 60,000 kg payload on a 12,500 × 2,500 mm drop deck
  • Detachable gooseneck for drive-on loading
  • 2, 3 or 4 axles; mechanical or air suspension
  • 12R22.5 tyres, landing gear to the customer's choice

Description

In short: A 60 t detachable gooseneck lowboy trailer with a 12,500 mm drop deck for excavators, wheel loaders and other engineering equipment. The gooseneck detaches so machinery can be driven straight on from the front — no loading ramps needed.

The drop deck keeps the centre of gravity low, which is why lowbed trailers are the standard choice for plant and machinery. A detachable neck also lets the deck be loaded and unloaded where a fixed gooseneck would foul the machine. Deck length, axle count and suspension are built to order; 2, 3 and 4 axle versions are available.

Every unit is shot blasted and painted in our own workshop; see the certificates and test reports we hold.

Key facts

  • 60,000 kg payload on a 12,500 × 2,500 mm drop deck
  • Detachable gooseneck for drive-on loading from the front
  • 2, 3 or 4 axles; mechanical or air suspension to order
  • 12R22.5 tyres; landing gear to the customer’s choice
  • Lead time 15 working days for one unit, 30 days for 2-10 units
  • Ships CKD in 40HQ containers, or as a complete unit on a bulk carrier

Related reading

For heavier machinery see the heavy duty lowbed trailer 60-100T, and browse the rest of the lowbed and lowboy range. Buyers usually ask how to get a quotation, whether we build to specification and how long production takes.

Specifications

Payload capacity 60,000 kg
Overall dimensions 12,500 × 2,500 × 3,300 mm
Axle 2, 3 or 4 axles
Gooseneck Detachable
Suspension Mechanical or air suspension
Tyre 12R22.5
Landing gear Customer's choice
Lead time 15 working days for one unit; 30 days for 2-10 units
Shipping CKD in 40HQ container, or bulk carrier (breakbulk) for a complete unit
  • Quotation within 2 working hours
  • Production 15–30 days after order confirmation
  • Spare parts and technical support after the sale
After-sales & spare parts

Related trailers